PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Core drilling the 4th floor bathroom Facing North.jpg Installed storm piping up to the 2nd floor Facing North.jpg Installing metal framing around the arch at the 2nd floor Facing North.jpg Started the bathroom roughing at the 2nd floor Facing South.jpg Welded clips along the column at the 3rd floor North Elevation.jpg Welded clips at the 3rd floor West Elevation.jpg
Previous pageNext page Welded clips along the column at the 3rd floor North Elevation
Welded clips along the column at the 3rd floor North Elevation